Farmers Wife 30's is coming along. Lately, I have been procrastinating so I have been having to bust my 4 blocks out a day or so before class. I need to get back on track doing them every week but it hasn't happened yet.
I have 4 more blocks to go and I will be done with Row 2 - needs those this month so I better get busy. Only 9 more rows to go I think.
Michelle
Showing posts with label farmers wife 30's. Show all posts
Showing posts with label farmers wife 30's. Show all posts
01 May 2016
11 February 2016
Farmers Wife 30's - Feb Blocks
I finally stopped procrastinating and finished my last 2 blocks for February. It had nothing to do with the fact that I need them by next Saturday and I work 3 days next week either....nope...not at all.
It turned out the last 2 were rather easy compared to the one before that.
It turned out the last 2 were rather easy compared to the one before that.
Sonnie (92) - paper pieced this little thing.
There were some mighty small pieces in that 9 patch.
Prudence (87) - template.
I originally tried to paper piece but with those pesky set in seams I had to rethink.
Out came the template and that is the way I went. It still looks a little wonky but in the grand scheme of things I know it will be ok.
Jewel (46) - paper pieced and easy. Nice for a change
Milly (62) - Just some regular HST's. Although it does look a little busy but that is the way the pattern went. I just substituted pink where green was supposed to go.
I am now ready to move one to March blocks (well, maybe next week) lets just hope I have some more easy ones. I now have 8/99 done. On a roll.
Michelle
06 January 2016
Farmer's Wife 30's #1 and a Finish
I usually always (lol) start the year with a bang. I take a week off and can breeze through things. Then, I go back to work and things slow down. I am really hoping that doesn't happen this year.
Yesterday was a slow day. I read a little and worked on a sock (which may be the death of me). Anyway, this morning I was back up and cruising. I ran out of my leader and ender project so after about an hour of cutting I was back at the machine.
I am teaching a class this year, Farmer's Wife 30's. Not really teaching but guiding. So I am trying to stay ahead of the game. I was planning on doing 5 blocks a month but these little things are so tedious that I decided 4 would be enough. I am making it a personal goal of doing 2 a week but we will see how that goes. There are only 99 of them so I have a bit of work to do.
Yesterday was a slow day. I read a little and worked on a sock (which may be the death of me). Anyway, this morning I was back up and cruising. I ran out of my leader and ender project so after about an hour of cutting I was back at the machine.
I am teaching a class this year, Farmer's Wife 30's. Not really teaching but guiding. So I am trying to stay ahead of the game. I was planning on doing 5 blocks a month but these little things are so tedious that I decided 4 would be enough. I am making it a personal goal of doing 2 a week but we will see how that goes. There are only 99 of them so I have a bit of work to do.
Here are the first 4 blocks. I am putting them together as I go and this will be the first column. I have made the triangles over sized so that I can trim them down later.
#19 Carolina
#63 Mollie
#3 Alice
#1 Addie
These have all been paper pieced so far. They are a little fiddlie and take some time but I think it will be great once it is done. I just hope I don't run out of patience or "like" of it sooner than that.
I did finish another quilt as well. I finished piecing it last year and then gave it to a co-worker to quilt. She did a lovely job on her George, it wall all freehand too. Awesome. I have since added the binding and as I type it is in the washer. It will head back to work this week to hang as a sample so no telling when I will see it again.
It turned out to be a tad bigger than I thought. But I love it.
Have a great week and see you on On the Needles Friday.
Michelle
Subscribe to:
Posts (Atom)