29 March 2013

No Pooling For Me

Judy over at Patchwork Times has a pooling challenge for socks going on.  I'm a slow knitter but I love socks so I thought what the heck..I have 2 months until the dead line. Yeah right....I can't get a sock to pool for the life of me.

I have attempted 4 different yarns (I think), and still no such luck and the sad thing is I refuse to tink the ones I have already started. So, in the last week I have cast on at least 4 socks..I can say I did take the first one apart but that is it.  I have one more pair of needles and a couple more sock yarns I might try...if not I will give up and at least try and have one of these sets of socks done before the challenge is over.  Good news is I will get a set of socks done right....

First attempt...no such luck..ended up taking it off the needles. Does look pretty all caked up though.


Second attempt..Haven't used the brown one yet..


Turned out to have great stripes though...


 
Great stripe but I don't even know where the picture went with the calendar and before caking
Latest attempt...still working on the ribbing..so maybe I will have some time tonight to get into the leg and some miracle will occur and after upteen attempts I will have a pool.



I did cast all of these on with 2.5mm needles and 64 stitches...it is a plain vanilla sock and I am just not that good with going out of the box yet.  I kept using the same size needles because for some reason I have a ton of them.. I do have a couple more choices I may try since I do have a few days until March is over...hmmm what to do...

I can say that I will be ordering me some more Cubics needles I love them....

Well off to find some pools..for more pooling head on over to Judy's.


Michelle

PS.  I even thought about taking a nice drive up to The Loopy Ewe this weekend, that is how crazy this is making me.  In a good way..I think.

11 March 2013

Design Wall Monday 3/11/13

I was busy this last week..well mostly Sunday.

I finished my Vista 1 top. I ended up not quilting it but it is now at the store hanging with the kits.

 
 
 

I also finished April's Schnibbles quilt for class...this was Decoy made with Love Letters fabric. I ended up just meandering the whole thing, but now I wish I would have done something different...oh well..
 

I then was able to finish piecing the top for May Schnibbles. Cindy Lou Who?.  It didn't come out exactly the way I had wanted it but it still works.  I didn't have enough of the colors I wanted to use in my charm packs but it is good.  Now, hopefully I can get this puppy quilted this week.


I hope to get some sewing done this week but there might not be much of that. Football for the boys starts tonight.  Which in turn means practice for one of them everyday but Sunday.  I usually don't have to worry about it since hubby is one of the coaches, but, Ryan (middle son) is playing this year and he is on a different team at a different field. So I am now the designated practice person for him, except on Monday's...yeah...hopefully I will get lots of knitting and hand sewing done in those 2 hours..or maybe just read who knows.

For more eye candy head on over to Judy's.

Off to knit a little before I work the late shift today...


Michelle





04 March 2013

Deisgn Wall Monday 3/4/2013

My design wall is still full with Dear Jane, Sylvia's and Bowtie Blocks. So I have moved to the ironing board.

This is a shop sample that as soon as I get the rows sewn together it will be done. I was going to quilt it but I have to much on my plate right now...What's new right.

These are the bottom rows.  It continues from the purple all the way up to pink with yellow and orange in it as well.
 
 
 
I am hoping to finish this today.  I also have a Schnibble to quilt and another one to start (May's class).  I don't seem to ever catch up.
 
Good news though I finished 10 more Dear Jane blocks.  I have less than 50 left and can not wait to be done.
 
For more eye candy head on over to Judy's
 
 
Take care,
Michelle

28 February 2013

Get It Done - March, 2013





I am finally able to participate in my first Get it Done for the year. I have tons of things that need to be done and that I want to get done, but I have narrowed it down to just a few...needs that is.

My list for March---

             1. Complete 10 Dear Jane Blocks.
             2. Complete 5 Sylvia's Sampler blocks
             3. Quilt and Bind Decoy Schnibbles for April Class
             4. Cut, Sew, Quilt, Bind Schnibbles for May Class - Cindy Lou Who
             5. Finish Vista 1 sampler for work.

There are 5 things on my list this month because I have to get them done. It will be really nice when I can get more things on my want to get done list completed that is for sure.

I also decided to keep a little Get It Done list for knitting.

March ---

     1. Plain  yellow sock number 1 finished.
     2. Honey Cowl finished.

Check in next month to see if I actually accomplished anything.

For more Get It Done's head on over to Judy's....it is really helpful to see what others have finished off their goal list for the month. Motivating for sure.

Have a great day everyone.

Michelle



22 February 2013

On The Needles 2/22/13

I'm back...well for this week anyway. I have been knitting during the move but not very much.

I have started another project though.


I am still working on my sock.  I just get side tracked with other things..like new projects..or applique that has to be done.




I started a honey cowl, almost done with that. I would really like to finish that soon. I just love, love, love this yarn.  It is Misti Alpaca, 83% cotton, 17% silk.  I really want to get me some more. It is really not as pink as this photo.  It is more fall autumn colors.


I then started a temperature scarf. It will be in a 8 rainbow colors. I have been keeping track of the temperature since the beginning of the year. I told my self I wouldn't cast on until the cowl was done but that didn't work too well. I have only done a couple of rows.  So I need to get going with that so I can finish that on time at the end of the year.

This scarf changes color depending on the temperature for the day. I have gone by increments of 10 degrees (I think). So the gray is the separator and then goes from blue all the way to yellow. Of course I have only done a couple of days here. I will end up doing 2 rows of seed stitch for every day of the year. I have a lot of catching up to do, almost all of Jan. and all of Feb.

I really need to get these projects done as my list of what is next is getting longer. I have another cowl, tons of socks, a summer sweater for me (a first attempt) and a kimono type cardigan for my mother (who has already asked me if I have started it yet)....I just need more time in the day or more days in a week. Unfortunately my time will be shortened since I have a heavier than normal work schedule next month..just let me say I hate taxes and furloughs.

For more needle candy head on over to Judy's.

Michelle

18 February 2013

Design Wall Monday 2/18/2013

I just realized this is my first design wall of the new year. With the move and all I have just been very busy. But, alas my new design wall is put up.  It only took about 5 hours to do. It would have been a very easy task it I would have had dry wall up. Since I only have foundation walls down here in the basement on the outside walls it took along time, drilling into concrete is not a fun task, just ask my husband. But, the design wall is up in the hallway and is done. I do have to use pins to hold the blocks up, mainly because it is a hallway and with a teenager, a pre-teen, husband, cat and dog it is the easiest way to make sure my hard work does not move.

The new design wall.  This is 4 sections of sheathing/insulation, each section is 4x7. I thought it would be plenty big but....

Sylvia's Bridal Sampler, it is so long I put the first blocks on the ceiling.  Hubby thought it was quit interesting. There are more blocks hidden behind the bow tie blocks.

Dear Jane is starting to come together. It has been a bad word around here for quit a few months. I am just ready for it to be done. We have about 50 blocks left. So by the time we are done it will have been a little over 2 years that we have been working on it.  The scary thing....I am seriously considering doing another one....am I crazy or what.

I finally finished my bow tie blocks that I had been working on as leaders and enders. I know Bonnie Hunter and the crew finished awhile ago and moved onto spools but I just had too many left to do. But now these are ready to be sewn together and I already have started another leader and ender project. More on that later.

I tried to get the complete picture here but with the hallway not cooperating this was the best I could go. I sewed these into 9 patches and now have to sew them together. It is going to be a 9x7 setting I think or something crazy like that.
 
 
Now, I need an opinion. Should I find a border to put on it or just bind it. I am thinking of just binding it but then what color should I bind it. I don't have anymore of the cheddar. I thought about black and I also thought about scrappy.  What do you think?
 
Well that is what is on my Design Wall for this week and very well what will be up there for a while to come.  For more ideas head on over to Judy's.
 
Have a great day everyone,
Michelle

17 February 2013

It's Starting to Come Together 2

I realized I forgot to post the few pictures of the quilt room since the move.

This hasn't seen a major improvement since the first pictures posted, other than more crap set in here.

This is walking in the door. I did get a new cover for my ironing board and had to shorten it since it didn't fit, but now have a smaller one next to the sewing machine.

This is walking in far enough to pass that weird hallway, see picture below. I have put my Koala table back together and now my room is much smaller. I don't know if it will stay like this but I have to much to do right now to move things around this week.

Here is the funky hallway.  I would really like to see if we need that little wall there. If I don't that may come down soon. It would give me some more room to play with moving my table around in there. If not I may be moving the stuff in the den area into this room and moving my sewing table out there. If I do that I can move the long arm into this room and then I would make the other bedroom a spare bedroom with extra stuff in there.  Who knows, it will probably be another 6 months to a year before I have everything figured out, maybe even longer.
 
I will be buying a nice sturdy long shelving unit to put in the "closet" in the sewing room. Right now it is just piled with my stuff that I haven't "gotten round to" and is an eye sore. I will get to that soon I hope it is just I need to sew, sew, sew.
 
Off to sew now, so have a great Sunday night.
 
Michelle